top of page

Our Work

At Edge line Analytics we're in the business of creating results that make a difference. 

Engineering
Construction Site
Traffic Design Management and Coordination at Newark Liberty International Airport
Challenge:

Effectively manage the transportation planning and traffic engineering design for the construction of new Terminal A and ConRAC parking garage

​

Response:
  • Support planning and design of roadway frontages & pedestrian walkways for new terminal and parking garage

  • Reviewed shop drawings, specifications, RFIs and other submittals to ensure compliance with MUTCD, AASHTO and PA Traffic Standards and Guidelines

  • Developed design drawings and details on AutoCAD

  • Communicated new road network behaviors and changes to all mapping services

  • Coordinated with Resident Engineer and contractors to ensure driver & vehicular safety at all areas during construction

​

Impact:

  • Seamless roadway transition from existing Terminals to the new Terminal A

  • Ease of navigation for drivers traveling to the new Terminal and ConRAC parking garage

  • All roadway changes and closures effectively reflected on mapping services

  • Minimal traffic impact during construction

​

Team Lead: Adil Malik

​

​

​

​

Follow me on 

LI-In-Bug.png
Adil Malik_edited_edited.jpg
bottom of page